The Port Hope Area Initiative (PHAI) is one of North America’s largest nuclear and environmental remediation programs, led in collaboration with Canadian Nuclear Laboratories (CNL). The multi-year initiative involves removing low-level radioactive waste (LLRW) from over 400 residential and commercial sites and 400+ road allowances, transporting it to a long-term waste management facility (LTWMF) for safe storage.
Ä¢¹½´«Ã½ is responsible for full-scale Engineering, Procurement, and Construction (EPC), including site characterization, engineering work packages, and remediation. Delivered through a construction-led, assembly-line approach, each site is restored to its original or improved condition.
Partnering with GHD Engineering, Ä¢¹½´«Ã½ integrates engineering and construction teams into a unified delivery group. This model enables production of 25+ design packages monthly and the ability to complete over 100 sites annually. Advanced work packaging, resource leveling, and proactive planning reduce rework, accelerate timelines, and minimize costs.
Ä¢¹½´«Ã½â€™s collaborative approach has resulted in higher throughput, enhanced safety, and strong schedule performance - with 80 design packages completed in 3.5 months and 39 sites remediated in just 7 months. These outcomes reflect Ä¢¹½´«Ã½â€™s ability to deliver complex EPC programs with precision, accountability, and operational excellence, while maintaining a scalable, efficient delivery model that supports long-term program success.